Publications


  • 27-September-2013

    English

    OECD Territorial Reviews: Antofagasta, Chile 2013

    Chile has been very successful in turning its natural resource endowments into a generator of growth and modernisation. However, its mining regions, including Antofagasta, face the challenge of developing a critically important primary sector in a manner that contributes to both economic growth and broader measures of well-being. Antofagasta's long term sustainability goals include a more diversified economic base, supported by a city that is lived in for its high quality of life and the opportunities it offers. To achive this, it will need to make the most of its natural endowments, improve the city's physical attractiveness and ensure better urban policy outcomes. It will also require regional and local actors to act in a strategic and innovative manner. This study focuses on economic diversification, urbanism and governance in the city of Antofagasta. Consideration is given to: economic and socio-economic trends such as those associated with labour markets and skills, as well as quality of life factors; opportunities for specialisation, diversification and innovation within and beyond the mining cluster, including throught its port network; urban policy challenges especially in land use, waste management, environment and public transport; and to the role of public governance in helping the city realise its economic and quality of life objectives.
  • 26-septembre-2013

    Français

    Une meilleure réglementation des partenariats public-privé d'infrastructures de transport

    Les pouvoirs publics s’efforcent souvent d’attirer le financement privé en s’appuyant sur des partenariats public-privé (PPP), afin de maintenir l’investissement tout en limitant les dépenses publiques. Le bilan des PPP est toutefois mitigé. Dans le secteur des transports, les projets PPP ont dans certains cas permis de réaliser d’importantes économies, mais ils ont plus souvent donné lieu à des dépassements de budget. Les PPP sont exposés à une surestimation des recettes et lorsque les projets rencontrent des difficultés financières, les risques ont tendance à revenir à la charge du contribuable.Le rapport examine la nature des risques et de l’incertitude liés aux différents types de projets PPP ainsi que les conséquences pratiques du transfert des risques aux partenaires privés. Il évalue l’impact budgétaire des PPP et examine les procédures budgétaires et les règles comptables en vue de limiter le passif que les PPP peuvent créer dans les finances publiques. Il fait aussi le point sur les avantages respectifs des péages, des paiements de disponibilité et des modèles de base d’actifs régulés pour attirer les investisseurs privés vers le financement des infrastructures publiques sur une base durable.
  • 24-September-2013

    English

    Transition Towards a Sustainable Nuclear Fuel Cycle

    Future fuel cycle characteristics, feasibility and acceptability will be crucial for the continued development of nuclear energy, especially in the post-Fukushima context. Fuel cycle choices have both long- and short-term impacts, and a holistic assessment of their characteristics, cost and associated safety issues is of paramount importance. This report associates quantified impacts with foreseeable nuclear energy development in different world regions. It gives initial results in terms of uranium resource availability, fuel cycle facility deployment and reactor types. In particular, the need to achieve short doubling times with future fast reactors is investigated and quantified. The report also provides guidelines for performing future studies to account for a wider range of hypotheses on energy demand growth, different hypotheses regarding uranium resource availability and different types of reactors to be deployed.
  • 24-September-2013

    English

    Summary of the Fourth International Nuclear Emergency Exercise (INEX-4) - Exercise Conduct and Evaluation Questionnaires

    The International Nuclear Emergency Exercise (INEX) series, organised under the OECD Nuclear Energy Agency (NEA) Working Party on Nuclear Emergency Matters (WPNEM), has proven successful in testing, investigating and improving national and international response arrangements for nuclear accidents and radiological emergencies. Early INEX exercises focused on the national and international aspects of early phase management of nuclear power plant emergencies. Starting with INEX-3 (2005-2006), the international community began looking at issues concerning longer-term consequence management. In 2008, the WPNEM started preparing the INEX-4 series, which was conducted in 2010-2011 and addressed consequence management and transition to recovery in response to malicious acts involving the release of radioactive materials in an urban setting. The goal of INEX-4 was to provide a basis for enhancing emergency management through the exchange of exercise experiences from participating countries and the identification of good practices and common issues. This summary report provides general outcomes based on country responses to the INEX-4 evaluation questionnaire and suggests areas of focus for future consideration.
  • 23-September-2013

    English

    Nuclear Energy Today (Second Edition)

    Meeting the growing demand for energy, and electricity in particular, while addressing the need to curb greenhouse gas emissions and to ensure security of energy supply, is one of the most difficult challenges facing the world’s economies. No single technology can respond to this challenge, and the solution which policy-makers are seeking lies in the diversification of energy sources.Although nuclear energy currently provides over 20% of electricity in the OECD area and does not emit any carbon dioxide during production, it continues to be seen by many as a controversial technology. Public concern remains over its safety and the management of radioactive waste, and financing such a capital-intensive technology is a complex issue. The role that nuclear power will play in the future depends on the answers to these questions, several of which are provided in this up-to-date review of the status of nuclear energy, as well as on the outcome of research and development on the nuclear fuel cycle and reactor technologies.
  • 20-September-2013

    English

    Energy Policies Beyond IEA Countries: Estonia 2013

    This review of Estonia’s energy policies analyses the energy policy challenges and opportunities facing Estonia, and provides critiques and recommendations for future policy improvements. It finds that Estonia is actively seeking to reduce the intensity of its energy system. Many of these efforts are focused on oil shale, which the country has been using for almost a century and which meets 70% of its energy demand. While it provides a large degree of energy security, oil shale is highly carbon-intensive.
    The government is seeking to lessen the negative environmental impact by phasing out old power plants and developing new technologies to reduce significantly CO2 emissions.The efforts on oil shale complement Estonia’s solid track record of modernising its overall energy system. Since restoring its independence in 1991, Estonia has fully liberalised its electricity and gas markets and attained most national energy policy targets and commitments for 2020. It has also started preparing its energy strategy to 2030, with an outlook to 2050. Estonia is also promoting energy market integration with neighbouring EU member states.
  • 20-September-2013

    English

    OECD Integrity Review of Italy - Reinforcing Public Sector Integrity, Restoring Trust for Sustainable Growth

    In response to the ongoing economic crisis, Italy is undertaking a series of critically important reforms, combining pro-growth policies with severe austerity measures to achieve fiscal consolidation. The success of these structural reforms will rely heavily on the capacity of the government to restore trust in its ability and commitment to guide the country towards sustainable economic growth. At the time of this publication, however, less than a quarter of Italian citizens trusted the quality of government decision-making. Concerns over public integrity and corruption stand out as key elements underlying this prevailing lack of trust.To restore the deficit of trust in the Italian government, the public sector needs to be embedded within a comprehensive integrity framework. Law 190 of November 6, 2012 (the Anti-Corruption Law) enshrines public sector integrity management and strengthens existing corruption prevention provisions through the designation of a new anti-corruption authority, a detailed framework for the adoption of a national anti-corruption plan, and new provisions regarding the conduct and prevention of conflict of interests in the public sector.This OECD Integrity Review provides guidance on the implementation of key integrity and corruption prevention elements of the Law, most notably those concerning institutional coordination, the regulation of conduct and whistleblower protection, and management of integrity risks in public sector activities. The review concludes each chapter with proposals for action, with OECD member countries’ best practices in mind, with the ultimate goal of supporting Italy in its efforts to enhance integrity in the public sector and restore trust.
  • 15-September-2013

    English

    The People's Republic of China – Avoiding the middle-income trap: Policies for sustained and inclusive growth

    This book provides an overview of the key challenges currently faced in China and OECD's main policy recommendations to address them. Drawing on the OECD’s expertise in comparing country experiences and identifying best practices, the book tailors the OECD’s policy advice to the specific and timely priorities of China, focusing on how its government can make reform happen.
  • 2-September-2013

    English

    Water Security for Better Lives

    This publication examines the critical issues surrounding water security (water shortage, water excess, inadequate water quality, the resilience of freshwater systems), providing a rationale for a risk-based approach and the management of trade-offs between water and other (sectoral and environmental) policies.
     
    The report sets out a three-step process to 'know', 'target' and 'manage' water risks: (1) appraising the risks, (2) judging the tolerability and acceptability of risks and weighing risk-risk trade-offs, and (3) calibrating appropriate responses.
     
    The publication provides policy analysis and guidance on the use of market-based instruments and the complex links between water security and other policy objectives, such as food security, energy security, climate mitigation and biodiversity protection.
  • 23-août-2013

    Français

    Études économiques de l'OCDE : Colombie 2013 - Évaluation économique

    Études économiques de l'OCDE : Colombie 2013 examine les développements récents, la politique et les perspectives économiques de ce pays. Ce rapport étudie plus en détail les inégalités, la productivité et la croissance.
    Also AvailableEgalement disponible(s)
  • << < 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 163 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 > >>